Design arguments inside a team are usually won by whoever is most persistent, most senior, or most willing to keep talking. None of those correlate with being right.

A weighted decision matrix does not remove judgment. It makes the judgment explicit, so the team is arguing about criteria and weights, which is a productive argument, rather than about conclusions, which is not.


How It Works

  1. List the criteria that actually matter for this decision.
  2. Weight each criterion from 1 to 5 by how much it matters.
  3. Score each option from 1 to 5 against each criterion.
  4. Multiply and sum. The weighted total ranks the options.

The critical rule is ordering: weight the criteria before you score the options. Doing it the other way lets the team quietly tune the weights until the favorite wins, which produces a matrix that documents a bias rather than a decision.


Choosing Criteria That Are Not Redundant

Weak matrices list five criteria that are all the same criterion in different words. "Fast," "quick cycle," and "efficient" will be scored identically and triple-count one factor.

Criteria that tend to be genuinely independent for FTC mechanisms:

CriterionWhat it captures
Cycle timeHow fast the mechanism completes its job
ReliabilityHow often it works out of many attempts
Build difficultyHours, tooling, and skill required
WeightMass added to the robot
ServiceabilityHow fast it can be repaired between matches
PackagingWhether it fits the size envelope and clears other subsystems
CostParts you have to buy

Pick four to six. More than six and the weighted totals converge, because everything ends up mattering a little.

Weight from strategy, not from habit

If your strategy is high cycle count, cycle time gets a 5 and weight might get a 2. If your strategy depends on a heavy arm reaching far, weight gets a 5. The weights are where your strategy enters the mechanical decision, and they should differ between teams with different strategies.


Try It

The matrix below is pre-filled with three intake concepts. Change the criteria, the weights, and the scores to match a real decision your team is facing.

BringCriteria your team weighted before anyone scored an option.
ChangeA weight, and see whether the ranking survives.
ReadThe margin. Within a few points means prototype both.

Weighted Decision Matrix

Score each option 1 to 5 against criteria your team weighted first.

Weighted scores
Passive wedge inta65 (87%)Active roller inta60 (80%)Claw on a wrist39 (52%)5 point margin over Active roller intake
LeaderOther options

A clear leader. Record the matrix in the notebook with one sentence per rejected option explaining what lost it.

OptionCycle time (x5)Build difficulty (x3)Reliability (x5)Weight (x2)Score
60 (80%)
65 (87%)
39 (52%)

Passive wedge intake wins by 5 points. Write the matrix into the notebook along with one sentence on why each losing option was set aside. That sentence is what judges ask about.

Weight the criteria before you score the options. Doing it the other way around lets the team quietly tune the weights until the favourite wins, which produces a matrix that documents a bias instead of a decision.

Values are not saved. Nothing is sent anywhere.Open in the workbench


Reading the Result Honestly

A matrix output is not a verdict. Read it in three steps.

If one option wins by a wide margin, that is a real signal. Record it and move on.

If the top two are within a few points, the matrix has told you something useful: these options are close, and the scoring noise is larger than the difference. Prototype both. This is the correct outcome, not a failure of the method.

If the winner surprises everyone, do not immediately adjust the weights. First check whether the surprise comes from a criterion that was weighted higher than the team actually believes. If the weights were honest, the surprise is information.

A matrix cannot score what you have not measured

Scoring "reliability" for a concept nobody has built is a guess wearing a number. That is acceptable for an initial screen, but it is not evidence. After prototyping, re-score the matrix with measured values and see whether the ranking survives. In Module 10 you will collect the data that makes those scores real.


What Goes In the Notebook

Photograph or redraw the completed matrix, and add one sentence per rejected option explaining what specifically lost it. "The claw scored lowest because its 4 second alignment time made the cycle 40 percent slower than the requirement allowed" is the sentence judges ask about.


Fill-in-the-Blank Practice

  1. Criteria must be weighted __________ the options are scored, so the weights cannot be tuned to favor a preferred outcome.
  2. When the top two options finish within a few points of each other, the correct next step is to __________ both.
  3. Scoring a concept for reliability before anything has been built produces a __________ rather than evidence.
Show answers
  1. before
  2. prototype (build rough versions and test)
  3. guess (an estimate, not measured data)

Exercise

Take the two surviving concepts from the Module 0 exercise and score them properly. Weight the criteria as a full team before anyone sees the scores. Record the result in the notebook with the rejection sentences.

Ready to move on?

Sign in with Google to save your progress with Telemark, or continue without saving.

Stuck on this lesson?

Ask about anything on this page. It can see which lesson you have open and which part you are reading.